Concrete Cure Time | Rules of Thumb for 2023 (2024)

Jump to:

Wondering about concrete cure time? You’re in the right place.

We’ve rounded up all the information you’ll need to successfully complete your next concrete project.

Read on to learn all you need to know.

How Long Does Concrete Take to Cure?

Concrete Cure Time | Rules of Thumb for 2023 (1)

Ron Alvey/Shutterstock

Concrete cure time varies by climate, moisture level, and concrete type, but there are a few rules of thumb to follow.

Staying off the concrete for the recommended amount of time ensures that it has enough time to cure, preventing future damage and making your investment worth the money.

The Quick Answer

Concrete needs to cure for 24 to 48 hours before it’s safe to walk on.

It takes seven days for the concrete to cure enough to support vehicles and heavy machinery.

After 28 days, the concrete is fully cured and has reached its maximum strength.

Factors Affecting Concrete Cure Time

After a week, the concrete has 70% of its strength and should be cured within a month of pouring.

Some factors that can extend curing times or prevent the concrete from settling include the weather and ingredients in the mix.

Moisture

The right amount of moisture is critical during curing. Too much water and the top layer will start flaking and crumbling.

Not using enough water causes the concrete to dry faster, and this is not what you want. When concrete dries too quickly, it loses strength and cannot support normal weight loads.

Problems with moisture often occur during the mixing stage, but the weather can also play a role. Rain and high humidity can interfere with the curing process. It’s a good idea to check the forecast before you start mixing.

Temperature and Wind

Temperature, wind, and humidity affect concrete strength. The problem occurs when the top layer cures faster than the bottom one.

Concrete shrinks during drying. If one layer dries faster than the other, you’re left with an uneven slab.

Strong winds can have the same effect depleting the top layer of moisture, causing it to shrink faster than the bottom one.Humidity can have the opposite effect as heat and wind. Moisture is not evaporating from the slab, slowing down the curing process.

The bottom layer may dry faster than the top resulting in an unbalanced and potentially dangerous concrete slab.

Curing concrete in cold temperatures will take longer. It can also reduce the overall strength of the slab after it dries.Optimally, you want to cure concrete when temperatures range between 55 and 73 degrees Fahrenheit.

Concrete Mix

Concrete mixes are not the same, and setting times can vary. You can also add an accelerant to the mix to speed up the curing time.

Calcium chloride is the most common accelerant, but you can also find some brands without harsh chemical.

An accelerant can speed up drying by as much as three times compared to slabs with concrete alone. The accelerant helps to speed up cement hydration. As the moisture and cement mix, the concrete starts to settle and harden.

But there’s a downside to using an accelerant. The concrete loses some of its strength, but will still meet code requirements.

Accelerants are most often used in freezing temperatures when the moisture may freeze before hydrating the concrete.

Things to Consider

Concrete Cure Time | Rules of Thumb for 2023 (3)

Imagenet/Shutterstock

There are a few dos and don’ts to consider as you pour the concrete and wait for it to cure.

  • Always hose the concrete down with water during the first week, between 5 to 10 times a day. Known as moist curing, it can help concrete become up to 50% stronger than regularly cured cement.
  • Keep the concrete covered during curing, especially if you can’t hose it down every few hours. You can use a concrete curing blanket or inexpensive 4mm polyethylene sheeting. The cover helps keep moisture in, so the slab dries evenly and retains its strength.
  • Use pond curing for large concrete slabs. It can shorten curing times from seven to three days. Erect soil berms around the edges of the slab to hold the water in. Cover the slab with three feet of water and let it set. This method is often used to cure concrete slab foundations.
  • Don’t forget to insert control joints in the slab. Insert the joints a quarter of the way down in the slab for added strength. Place the joints in the concrete within 24 hours of pouring to avoid causing any damage to the slab.
  • You never want to pour concrete in freezing temperatures. It needs to remain above 50 degrees Fahrenheit for at least one week after pouring the concrete. If the temperatures unexpectedly drop, cover the slab with a concrete warming blanket. You can find them at most home improvement stores.
  • Avoid painting or staining the concrete for the first 30 days. It’s still hardening, and you can change the moisture or chemical makeup. Moisture still in the concrete may also prevent the paint or stain from adhering to the surface. For best results, wait until the concrete has sat for a month before starting any decorating project.
  • Don’t put excess weight on the slab during the first month. You want to avoid it completely during the first 48 hours. After two days, you can walk on the concrete and start bringing out light items after a week. If it’s a driveway, wait about 10 days before parking a vehicle on the freshly poured slab.

Frequently Asked Questions

Concrete Cure Time | Rules of Thumb for 2023 (4)

Aisyaqilumaranas/Shutterstock

You can have all of the information you need about concrete cure times and still have questions.

Don’t worry — we have the answers for you.

How long should concrete cure before putting weight on it?

Concrete cures in various stages determining when you can put weight on it. After two days, foot traffic is safe. You don’t have to worry about footprints. After a week, the concrete has 70% of its strength and can handle vehicles. You may want to wait a full month before driving heavy machinery over the new concrete slab. After 28 days, the concrete has cured to its full strength.

Is it okay if it rains after pouring concrete?

As a general rule, you don’t want to pour concrete in the rain. You can end up with too much moisture and uneven drying times.

Scaling, crumbing, and dust are common problems with rain-poured slabs. You not only ruin the appearance of the slab but also compromise its strength.

How long before it can rain on concrete?

Check the weather forecast before pouring concrete. You need at least 24 hours of dry weather for the slab to start curing properly.

Two days without rain is optimal but may not be feasible. If it does start raining before the slab has been set for a day, covering it with a sheet or blanket will help keep it dry.

What temperature will concrete set?

The best temperatures for curing concrete are between 40 and 60 degrees Fahrenheit, but some experts recommended letting the weather warm up to 50 degrees.

The reason the temperature is crucial is due to how the chemicals in the concrete react. Colder temperatures slow the process down, and hotter ones speed it up. Both will cause the slab to lose some of its strength.

What’s the Average Concrete Cure Time?

Concrete cure times can vary, depending on a few conditions, but within a month the slab is ready to support heavy equipment and building structures.

Pay attention to the temperature and rain forecast, and use covers to protect the drying slab whenever necessary.

If you take the time to let the concrete properly cure, you’ll have a slab that will last for years.

Resources:

Concrete Cure Time | Rules of Thumb for 2023 (2024)

FAQs

Concrete Cure Time | Rules of Thumb for 2023? ›

In average conditions, your concrete will dry enough to walk on in 24 to 48 hours and drive on one week later. In about 28 days, consider the concrete slab fully cured and apply any coatings you'd like. If you want to be 100% sure it's ready, complete a moisture test to confirm it's cured.

How long should concrete be allowed to cure? ›

The answer is that your concrete will be ready in a surprisingly short time. Your concrete should be solid enough to walk on, without leaving footprints, after anything from 24 to 48 hours. By seven days, your concrete should be cured to at least 70 percent of its full strength.

How long does 4 inch thick concrete take to dry? ›

The general rule of thumb is that concrete takes about 28 days to dry for every inch of slab thickness. Within 24 to 48 hours, the concrete will be ready for foot traffic.

How many days minimum required to achieve 70% concrete strength curing time? ›

What is the minimum curing time for concrete? For the majority of structures, the curing time at temperatures above 5º C (40º F) should be at least 7 days or until 70% of the specified compressive or flexural strength is attained, whichever is longer.

How long does 6 inches of concrete take to cure? ›

How long does four to six inches of concrete take to cure? As stated previously, concrete takes approximately 26-30 days to reach its full strength. If the concrete is professionally poured and floated, the curing process should be sound and ensure proper hardening of the concrete base.

What happens if concrete dries too fast? ›

Concrete dries too fast and might become weak or soft. The strength of the concrete after the initial curing period might decrease. Due to rapid water loss, plastic shrinking cracks might appear on the concrete's surface. The concrete could see reduced 28-day strength of up to 10 percent.

How long before concrete is not workable? ›

A 2-hour shelf life has been a historic general rule of thumb that should not be exceeded based on setting time test data from cement manufacturers. In practice the time required will depend on the ambient and concrete temperature, cement type, mix proportions, the use of admixtures and consistence.

Does spraying water on concrete help it cure? ›

DO spray new concrete with water. One of the most common methods for curing concrete is to hose it down frequently with water—five to 10 times per day, or as often as you can—for the first seven days. Known as “moist curing,” this allows the moisture in the concrete to evaporate slowly.

What happens if you don't water concrete? ›

Concrete that is not moist-cured at all dries too rapidly, and reaches less than half its potential design strength. It will also have a greater number of shrinkage cracks.

Is 4 inches of concrete thick enough for a driveway? ›

As for thickness, non-reinforced pavement four inches thick is standard for passenger car driveways. For heavier vehicles, a thickness of five inches is recommended.

How can I speed up my concrete curing? ›

What are some methods that can speed up curing process of concrete?
  1. Begin concreting in a hot environment or hot weather.
  2. Add calcium chloride to concrete.
  3. Cover concrete with plastic sheets.
  4. Add water-reducing admixture to the concrete mix.
  5. Add warm water to the concrete mix.
Sep 23, 2020

How do you know when concrete is fully cured? ›

Curing time of concrete is typically 24-48 hours, at which point it's safe for normal foot traffic. After one week, concrete is typically cured enough to handle continued construction including heavy machinery. Concrete is recognized to have reached full strength 28 days after placement.

Does concrete take 50 years to fully cure? ›

Curing times for concrete

Technically, concrete never stops curing. In fact, concrete gets stronger and stronger as time goes on. But, as far as we're concerned, to reach a practical strength, most industrial concrete mixes have a 28 day curing period.

Does rain affect curing concrete? ›

If the rain continues for several days, water accumulation on a concrete surface can slow down the curing process. As a result, the internal bond between mixture particles will be influenced, and concrete strength will be weaker than the designated strength.

What happens if it rains 6 hours after pouring concrete? ›

Once the concrete has been finished (between 4-8 hours after pouring) and has set hard enough for walking on, the effects of rain should be minimal. The curing process is a chemical reaction, with ready mix concrete taking up to 28 days to fully cure.

Should you water new concrete? ›

If water evaporates too quickly, it will weaken the finished product with stresses and cracking. To put it simply, the goal is to keep the concrete saturated during the first 28 days. The first 7 days after installation you should spray the slab with water 5-10 times per day, or as often as possible.

How long should 4 inch concrete cure? ›

To protect your new slab and ensure an exceptional finished product you should wait 24 hours for foot traffic (including pets), 10 days to drive light vehicles or add furniture, and 28 days for heavy pick-up trucks and RVs. After 28 days the concrete is cured and you will have a strong and stable slab.

How long should concrete cure before putting weight on it? ›

Curing time of concrete is typically 24-48 hours, at which point it's safe for normal foot traffic. After one week, concrete is typically cured enough to handle continued construction including heavy machinery. Concrete is recognized to have reached full strength 28 days after placement.

Is it OK if it rains after pouring concrete? ›

If the rain begins after 2-4 hours from concrete placement, the surface needs to be covered; otherwise, the concrete surface will suffer damages. If rains pound on concrete 12 hours after placement, the likeliness of any damage is negligible.

Top Articles
Latest Posts
Article information

Author: Dong Thiel

Last Updated:

Views: 6405

Rating: 4.9 / 5 (59 voted)

Reviews: 90% of readers found this page helpful

Author information

Name: Dong Thiel

Birthday: 2001-07-14

Address: 2865 Kasha Unions, West Corrinne, AK 05708-1071

Phone: +3512198379449

Job: Design Planner

Hobby: Graffiti, Foreign language learning, Gambling, Metalworking, Rowing, Sculling, Sewing

Introduction: My name is Dong Thiel, I am a brainy, happy, tasty, lively, splendid, talented, cooperative person who loves writing and wants to share my knowledge and understanding with you.